With prices for key energy resources constantly rising, the issue of energy saving and energy efficiency of public sector facilities is becoming particularly relevant. That is why our team does not stand aside, but annually joins the implementation of such projects with the involvement of international technical assistance (NEFCO), in particular, we have worked on
- restoration (renovation) of the secondary school No. 37 in Chernivtsi (2021)
- overhaul of the Pasichnyanska Junior School (kindergarten №6) in Ivano-Frankivsk (2021)
- reconstruction of the heating system of the secondary school No. 12 at 13 National Guard Street in Ivano-Frankivsk (2021-2022)
- reconstruction of the heating system of the secondary school No. 18 at 7 Troleibusna Street in Ivano-Frankivsk (2021-2022)
- reconstruction of the heating system of the natural and mathematical lyceum in Ivano-Frankivsk (2021-2022)
- major repairs with the implementation of energy saving measures in the buildings of Chortkiv Secondary School No. 7 of Chortkiv City Council (2022-2024)
- major repairs of the roof, facade, heating system (thermal modernization) of Lyceum No. 18 (secondary school No. 6) at 26 Komarova Street in Chernivtsi (from 2024 to the present), etc.
Replacement of windows and doors, restoration of thermal insulation of pipelines, replacement of radiators, arrangement of individual heating points, insulation of ceilings, facades, and basement, modernization of internal power grids, and installation of a centralized ventilation system are just a few of the activities that have been carried out. At the same time, all these measures are aimed at reducing energy costs and increasing comfort for users of public institutions.
Our team remains committed to its energy saving principles and is ready to implement new projects aimed at sustainable development and innovation!